The Cost Of Building A 4 Bedroom Bungalow House In Kenya

The Cost Of Building A 4 Bedroom Bungalow House In Kenya

The Cost Of Building A 4 Bedroom Bungalow House In Kenya

The Cost Of Building A 4 Bedroom Bungalow House In Kenya

The Cost Of Building A 4 Bedroom House Bungalow In Kenya

The cost of building a 4-bedroom house in Kenya can vary greatly depending on the location, size of the house, materials used, and finishing. However, on average, it costs between Ksh. 3.5 million to Ksh. 6.5 million to build a 4-bedroom bungalow house.

Factors Affecting Cost

Several factors account for the wide range in cost:

Location: It is more expensive to build in urban areas like Nairobi compared to rural areas due to the high land prices. Constructing the house in a major town can cost up to Ksh. 6.5 million for a 4 bedroom but reduced to Ksh. 3.5 million in a rural area.

Size of house: The larger the size of the house in terms of square feet, the more it will cost. A 4-bedroom mansion with extra amenities will cost much more compared to a basic 4-bedroom.

Building materials: Using expensive finishing like imported tiles, luxury kitchen cabinets increases costs compared to locally available materials. Opting for stone/bricks over timber also increases costs.

Labor: In some areas, availability of skilled labor is lower so wages are higher. Complex design and finishing also require specialized labor charge premium rates.

💥🎁 Christmas & Year-End Deals On Amazon !

Don't miss out on the best discounts and top-rated products available right now!

🛒 Shop Now and Save Big Today!

*As an Amazon Associate, I earn from qualifying purchases.

Professional fees: Architects, quantity surveyors, engineers charge 7%-10% of total costs. Complex structural design requires their input.

House Size Cost (Ksh.)
Basic 4 bedroom (1000 sq.ft) 3.5 million
Medium 4 bedroom (1500 sq.ft) 5 million
Large 4 bedroom (2000 sq.ft) 6.5 million

Table 1: Cost range for different sizes of 4 bedroom houses

Cost Breakdown

The following is a typical cost breakdown for constructing a medium-sized 4-bedroom house of 1500 sq.ft:

Item Cost (Ksh.) Percent
Land 1 million 20%
Building materials 1.95 million 30%
Labor 1 million 20%
Professional fees 50,000 1%
Finishing 1 million 20%
Total 5 million 100%

Table 2: Typical cost breakdown for a 1500 sq.ft 4-bedroom house

As shown in Table 2, the largest costs when building a 4-bedroom house in Kenya are materials, labor, land and finishing which together account for almost 90% of total costs. Professional fees for hiring architects, engineers etc. take up the balance 10%.

Building Materials Cost

Building materials like cement, iron sheets, tiles, timber etc. are major contributors to the construction cost.

💥🎁 Christmas & Year-End Deals On Amazon !

Don't miss out on the best discounts and top-rated products available right now!

🛒 Shop Now and Save Big Today!

*As an Amazon Associate, I earn from qualifying purchases.

The table below shows estimated costs for key (main) materials needed for a 1500 sq. ft 4-bedroom house:

Material Quantity
Cement 300 bags
Iron sheets 95 iron sheets
Timber 5,500 ft
Tiles 1500 sq.ft
Electricals Lumpsum
Plumbing Lumpsum
Stones 3600 pieces

Table 3: Estimated material costs

As shown in Table 3, a significant amount is spent on key building materials for a moderate sized 4-bedroom house timber, tiles and cement constitute the largest share.

The Cheapest Way To Build A 4 Bedroom House In Kenya

Building a 4-bedroom house in Kenya can be an expensive affair, with average costs ranging from Ksh 3.5 million to over Ksh 6.5 million. However, there are ways to reduce construction costs considerably through smart design, material selection and self-building certain parts.

The following simple designs, using affordable materials, hiring local labor and self-building aspects, the cost to construct a 4-bedroom house in Kenya can be reduced to Ksh 3.5-4.5 million.

💥🎁 Christmas & Year-End Deals On Amazon !

Don't miss out on the best discounts and top-rated products available right now!

🛒 Shop Now and Save Big Today!

*As an Amazon Associate, I earn from qualifying purchases.

However, location and size remain the biggest cost determinants. Compromising too much on quality is not advisable. With some prudent planning, building a cost-effective 4-bedroom home is quite achievable.

Factors Affecting Cost

The major factors affecting the cost of a 4-bedroom house include:

  • Location – Building in rural areas is cheaper than urban centers
  • Size of house – Large square footage increases material and labor needs
  • Materials used – Imported and premium materials cost more
  • Design complexity – Simple designs are economical than unique shapes
  • Finishes – Luxury fittings, tiles raise costs over basic finishes
Location Cost (Ksh.)
Rural 3.3 – 4.5 million
Urban 5 – 8 million

Table 1: Cost variation by location

Cheapest Construction Tips

Here are some ways to build a 4-bedroom house affordably:

  • Opt for square or rectangular layouts rather than complex shapes
  • Use timber for roof structure rather than expensive steel trusses
  • Go for 2 floors to reduce footprint and foundation costs
  • Use interlocking soil stabilized bricks rather than burnt clay bricks
  • Avoid basement design to limit excavation work.
  • Install locally available wood cabinets instead of imported modular kitchen
  • Finish with affordable acrylic paint rather than expensive textured paints
  • Limit use of premium fittings like imported sanitary ware
  • Do plumbing and electrical work yourself if skilled

Material Choice Matters

Choosing affordable construction materials can reduce overall costs significantly.

Material Cheaper Option Cost Savings
Bricks Interlocking blocks 30%
Roof Corrugated iron sheets 15%
Doors/Windows Local wood 20%
Floor Cement screed 10%
Wall finish Emulsion paint 15%

Table 2: Cost saving material options

💥🎁 Christmas & Year-End Deals On Amazon !

Don't miss out on the best discounts and top-rated products available right now!

🛒 Shop Now and Save Big Today!

*As an Amazon Associate, I earn from qualifying purchases.

As shown in Table 2, significant savings can be achieved by choosing cheaper material alternatives without compromising too much on quality.

Construction Labour Costs

Hiring skilled and unskilled labour locally rather than in cities can reduce labor costs by 15-20%. If one has the expertise, self-building the foundation and structural elements can lower expenses by up to 30%.

Work Cost (Ksh.)
Excavation 50,000
Foundation 150,000
Wall construction 250,000
Roofing 200,000
 Plaster, exterior, Interiors, and Fitting 400,000
Total 1,050,000

Table 3: Estimated labor costs

 

The Legal Requirements For Building A 4 Bedroom House In Kenya

Building your dream home in Kenya requires adhering to several legal requirements stipulated by various government agencies.

While the process may seem tedious, these laws are important for ensuring structural integrity, safety, and compliance with zoning regulations. This article provides a comprehensive overview of the key legal requirements for constructing a 4-bedroom house in Kenya.

💥🎁 Christmas & Year-End Deals On Amazon !

Don't miss out on the best discounts and top-rated products available right now!

🛒 Shop Now and Save Big Today!

*As an Amazon Associate, I earn from qualifying purchases.

Land Ownership and Title Deed

The first legal requirement is having a valid title deed that proves ownership of the land on which you intend to build your house.

The lands registry should have your name registered as the legal owner of the property. This title deed will be required when seeking approvals from relevant authorities before commencing construction. Without legally owning the land, you cannot start building.

Development Permission

Before breaking ground, you will need to obtain development permission from the County Government. This is basically a permit that allows you to construct on the land.

The County will verify that your building plans comply with zoning requirements such as plot ratios, size of houses allowed in the area, setback distances from the boundaries etc. Development permission is granted after paying the requisite fees.

The building code contains requirements for structural integrity, access, ventilation, sanitation etcetera. For example, the Code stipulates the maximum room size, ceiling height, size of staircases, standard size of doors among other things. Non-compliance can lead to demolition or penalties. Your contracted engineer should ensure adherence to the building code.

The county government will conduct interim inspections during construction to ensure your project is compliant with approved plans.

💥🎁 Christmas & Year-End Deals On Amazon !

Don't miss out on the best discounts and top-rated products available right now!

🛒 Shop Now and Save Big Today!

*As an Amazon Associate, I earn from qualifying purchases.

After completing the build, the county will undertake a final inspection and issue an occupation certificate if satisfied that you followed regulations. The house cannot be inhabited prior to receiving.

Table 1: Development Permission Fees in Selected Counties

County Fee
Nairobi KES 60,000
Kiambu KES 47,000
Machakos KES 45,000
Kajiado KES 48,000

 

Environmental Impact Assessment:

 For a house that exceeds 500 square meters, you’ll need an environmental impact assessment license from the National Environmental Management Authority (NEMA). NEMA will review your construction plans and give recommendations for minimizing environmental degradation.

For instance, they may require planting trees to offset soil erosion. The EIA license has to be obtained before applying for development permission.

Building Plan Approvals and Registration:

The National Construction Authority (NCA) vets and approves building plans for houses in Kenya. For a 4-bedroom house, you’ll need to submit detailed certified architectural drawings, structural and electrical designs, soil investigation report, and payment for them to review the plans.

💥🎁 Christmas & Year-End Deals On Amazon !

Don't miss out on the best discounts and top-rated products available right now!

🛒 Shop Now and Save Big Today!

*As an Amazon Associate, I earn from qualifying purchases.

The minimum time for approval is 30 days. NCA approval should also be obtained before commencing construction.

Licensed Professionals:

All engineers, architects, and contractors involved in the construction must be licensed by their respective professional bodies. The engineers and architects must be registered with the Engineers Board of Kenya and Architectural Association of Kenya respectively.

The NCA licenses contractors in different categories based on their qualifications. Confirm licensing to avoid working with unqualified personnel.

 