One method for repairing a cold joint is using a waterproof sealer. This keeps water out of the joint.
Installing reinforcing bars into the first layer before pouring a new one is another approach to reinforce the link between the two layers. Rebars will aid to connect both layers and boost the joint’s tensile strength.
Repairing concrete floors with cold joints has several advantages. Sealing the seams prevents water penetration and keeps your house dry and mold-free, putting an end to moisture problems.
Cold joint repairs can assist in keeping your home’s structural integrity. As a result, the value of your property will rise.
You will also prevent radon gas from entering your house and insects and rats from entering.
While cold joints in concrete foundations are not structurally significant, they can develop dry gaps that allow water to flow through your foundation wall. To examine and repair them, you need to employ a foundation contractor.
💥🎁 Christmas & Year-End Deals On Amazon !
Don't miss out on the best discounts and top-rated products available right now!
🛒 Shop Now and Save Big Today!*As an Amazon Associate, I earn from qualifying purchases.
How Do You Hang A Planter On A Concrete Wall?
Concrete walls are a strong and practical fence material, but they leave a lot to be desired in terms of aesthetics. Plant-hanger brackets have hanging hooks that protrude from the wall, allowing the baskets to hang freely.
If you were attaching them to a privacy fence, you would drive screws through the mounting surface; however, cinder blocks require concrete anchors to keep the screws in place.
Here’s how you can go about it:
- Place the plant hanging bracket against the wall to determine its ideal position. To establish the plant’s eventual hanging height, consider the length of the chain.
Insert a permanent marker through the cinder block barrier to indicate the location of the screw mounting holes.
- Using a power drill fitted with a masonry bit, drill a pilot hole into the cinder block at each point. The drill bit and concrete anchors must be the same size, and the concrete anchors must fit the screws provided with the plant hanger bracket.
- Place an anchor in each pilot hole. On a hammer, tap the anchors until the rims at the ends are flush with the fence.
- Place the plant hanger bracket against the fence and align the bracket’s mounting holes with the holes in the concrete anchors. Screw a screw into each mounting hole and the concrete anchors.
- Grasp the plant hanger with your hand and wriggle it back and forth to ensure it is properly attached.
Hang the hanging basket from the hook at the elbow. Slowly lower the hanging basket to check it can sustain the basket weight.
How Do You Increase The Height Of A Concrete Wall?
Here is how you can do it;
💥🎁 Christmas & Year-End Deals On Amazon !
Don't miss out on the best discounts and top-rated products available right now!
🛒 Shop Now and Save Big Today!*As an Amazon Associate, I earn from qualifying purchases.
Step 1
In a 5-gallon bucket, combine the concrete mortar powder and water per package guidelines. To avoid drying out, mix the amount of mortar you want to use within one hour.
Step 2
Using a mortaring trowel, apply a 1-inch-deep layer of mortar over the top of the existing block wall, spreading it 8 inches wide.
To make a furrow, draw the side of the trowel across the center of the mortar bed. Cover no more than three to four blocks at a time.
Step 3
Place the corner block. The completed edge of corner blocks is on the outside of the corner.
As appropriate, use a half or entire corner block to stagger the joints on the new layer over the joints on the block tier directly below.
If the previous top layer started with a full block, the new tier should start with a half block or vice versa.
💥🎁 Christmas & Year-End Deals On Amazon !
Don't miss out on the best discounts and top-rated products available right now!
🛒 Shop Now and Save Big Today!*As an Amazon Associate, I earn from qualifying purchases.
Step 4
Apply a 1-inch-thick coat of mortar to the second block’s edge. Set it in position, abutting the mortared edge against the first block’s edge.
As you lay each new block, continue to pour mortar into the borders and the top of the wall.
Step 5
Before the mortared seams set, run the edge of a masonry jointer along them. The jointer is used to smooth the seams between the blocks. Apply adequate pressure to the jointer to create seams that match the existing wall.
Step 6
In a clean bucket, mix quick-setting concrete according to package directions. Fill the holes in the blocks’ tops with the concrete mix. With the back of the trowel, smooth the top level.